TBM Tunga achieves breakthrough after tunnelling 936.6 metres in Bengaluru

TBM Tunga achieved a breakthrough on September 4 after tunnelling 936.6 metres between Kadugondanahalli station and Nagawara station’s South Cut and Cover Shaft

Leave a Reply

Your email address will not be published. Required fields are marked *

0 Comments
scroll to top