NCRTC Adopts Solar-Powered Infrastructure For Delhi-Ghaziabad-Meerut RRTS CorridorAuthorPosted byPublishedMay 26, 20248:55 amX (Twitter)FacebookLinkedInShare this postShare this postClose sharing boxNCRTC Adopts Solar-Powered Infrastructure For Delhi-Ghaziabad-Meerut RRTS CorridorX (Twitter)FacebookLinkedInPosted by on May 26, 2024. Currently, 2.21 MWp of solar power is being generated saving 2300 tons of CO2 emissions annually. Post Views: 16
President Droupadi Murmu congratulates Javelin thrower Ajeet, Sundar and high jumper Mariyappan,Sharad at Paris Paralympics
The PS2 is firmly holding onto its astronomical sales record as Sony announces a further 5 million units were somehow sold since it last reported numbers in 2012