How will South India’s first double-decker flyover in Bengaluru ease traffic?

The flyover, stretching 5.12 km, was built at a significant cost of ₹449 crore. It aims to alleviate the bottleneck at the Central Silk Board junction by providing a signal-free corridor from Ragigudda to HSR Layout and Hosur Road. This construction is expected to reduce travel time by over 30%

Leave a Reply

Your email address will not be published. Required fields are marked *

0 Comments
scroll to top